Year: 2008-2009
Client: Southwark Diocesan Board of Education
Project Status: Built
Budget: £1.2m
Following an arson attack on Halloween 2008 at Bishop John Robinson Primary School in Thamesmead, south east London NBA were commissioned by the Southwark Diocesan Board of Education as part of a team to reconstruct the damaged school.
Critical to the task at hand was the redesign, tender and construction of 50% of the 1 FE primary school and surrounding buildings by the start of the next school year in September 2009.
Despite the exceptionally tight timeframe the project was completed on time and on budget.
Quantity surveyor
Jim Barton
Structural Engineer
Roger Tant
Mechanical and electrical engineer
Assembly at re-dedication day
The refurbished front elevation